New equipment system for casting and smelting process
In the third decade of January the New Equipment system for casting and smelting process has been installed and launched at Riga JSC Electric Machine Works (JSC “RER”).
This New system has been designed and installed by TET Estel and includes 3t steel melting DC EAF, 2200 kW rectifier, cooling station and an additional set of collateral equipment.
This launch may be considered as a very important industrial milestone for JSC RER, that seriously improves production performance, provided by TET Estel, the true front-runner in production reliability and quality.